What recent LNG supply disruptions reveal about force majeure, alternative performance, and contractual flexibility alongside lessons for emerging fuel markets
In late October 2026, Edison announced that QatarEnergy had extended its force majeure notice until the end of December, affecting deliveries under the parties’ 25-year LNG supply agreement. According to Edison, the disruption had affected 38 cargoes, representing approximately 5 billion cubic metres of gas. Edison had replaced 27 cargoes, equivalent to approximately 2.7 billion cubic metres, and confirmed that it remained fully able to honour its commercial
commitments.[1]
We have previously written about the force majeure and mitigation issues raised by disruption to Gulf LNG supplies,[2] but an equally important question remains: where a supplier’s contracted source is disrupted but physically equivalent cargoes are available elsewhere, does delivering them satisfy the contract, and can either party insist on it? The answer turns on what “performance” means under a supply agreement, and whether having a substitute product is sufficient.
RTI v MUR Shipping: Alternative Performance is Not the Same as Performance
In RTI Ltd v MUR Shipping BV [2024] UKSC 18, the UK Supreme Court held that, absent sufficiently clear wording, a reasonable endeavours proviso in a force majeure clause does not require the affected party to accept its counterparty’s offer of non-contractual performance, even where doing so would overcome the force majeure event however commercially sensible that arrangement might be.[3] While the case was not related to an LNG supply agreement, it raises a relevant question: to what extent must parties consider alternative methods of performance when the agreed method becomes unavailable? The answer will depend on the particular contractual arrangements.
Available, but Contractually Deliverable?
QatarEnergy’s own recent statements illustrate the point. In late October 2026, its chief executive, Saad Sherida Al-Kaabi, explained that its strategy of securing LNG supplies from US producers, including a 20-year agreement to buy up to 3 million tonnes per annum (“mtpa”) from Woodside’s Louisiana LNG project and agreements with Cheniere Energy for up to 4 mtpa through 2054, was designed as a trading and arbitrage hedge, generating revenue if exports through the Strait of Hormuz are disrupted in future. He also said that QatarEnergy’s long-term customer contracts operate on a “point-to-point” basis, requiring deliveries from specific export terminals to specific destinations, and that US volumes therefore cannot be offered to those customers as a back-up.[4] The Woodside and Cheniere volumes do not flow until 2030 at the earliest. QatarEnergy does, however, already have US supply: it holds a 70% interest in the Golden Pass LNG project in Texas, which loaded its first cargo in April 2026, and its trading arm offtakes 70% of the project’s production.[5]
Being physically capable of obtaining alternative LNG is one question. Being able to use those volumes to satisfy an existing delivery obligation, which may specify a particular loading terminal, source or destination, is a separate question, as is using them to manage financial exposure through trading or portfolio diversification, without ever delivering a cargo against the original contract. QatarEnergy’s US purchases are, on its chief executive’s own account, a financial hedge against future disruption rather than a source of replacement supply under its existing agreements. Buyers may see it differently. Whether a contract is, in fact, point-to-point is a question of construction of that contract, not of either party’s characterisation, and a seller with volumes available elsewhere in its portfolio may find it harder to show that force majeure prevented performance, or that it has done all that was required.
The reasoning in RTI v MUR Shipping is relevant, but its reach should not be overstated. The Supreme Court emphasised that a reasonable endeavours obligation is aimed at maintaining contractual performance, and that clear words are needed before a party must give up a valuable contractual right. Applied to a genuinely source-specific LNG contract, absent clear wording to the contrary, a buyer is unlikely to be required to accept delivery outside the contractual specification merely because doing so would solve a supply problem. The position is different where the contract is a portfolio arrangement or permits supply from more than one source. Cargoes from those sources are then contractual performance, the question of non-contractual performance does not arise in the same way, and the focus shifts to what the seller’s mitigation obligation requires it to do elsewhere in its portfolio. Everything will turn on the specific supply agreement, and whether it restricts substitution, allows the parties to agree alternative arrangements by consent, or is silent on the point.
Some buyers are seeking to put the point beyond argument by building alternative supply expressly into the contract, rather than leaving it to negotiation, or dispute, once a disruption has occurred. Petronet LNG renewed its long-term supply agreement with QatarEnergy in 2024: 7.5 mtpa, on a delivered basis, for 20 years from 2028. Following QatarEnergy’s declaration of force majeure, Petronet has said it is in talks to include US-sourced LNG under the renewed contract, and that QatarEnergy is willing to consider offering a “certain portion of volume from other sources which they have tied up”.[6]
Where obligations extend across multiple relationships, the position becomes more complicated: a supplier may be excused under one agreement while its customer remains bound downstream. Disputes will likely arise over whether alternative performance was required or permitted, whether reasonable steps were taken to mitigate disruption, and who should bear the additional costs. Who bears that cost depends first on whether the force majeure claim succeeds. If it does, the seller’s non-delivery is excused and, subject to any continuing mitigation obligation, the loss generally lies where it falls. If it does not, the question is whether the buyer’s losses are recoverable. Under English law, the cost of replacement supply or cover is typically recoverable as a direct loss. A buyer’s liabilities to its own customers may also be direct, if they arise in the ordinary course; if they are recoverable only because the seller knew of particular downstream arrangements, they fall within the second limb of Hadley v Baxendale, which is generally what exclusions of “indirect or consequential” loss are taken to cover.[7] In practice, the more significant constraints are contractual: exclusive shortfall remedies, overall liability caps, and the interaction with take-or-pay obligations, including whether volumes lost to force majeure reduce the buyer’s minimum purchase commitment. Where a seller is alleged to have diverted contracted cargoes to higher-priced spot buyers, the buyer’s route outside those limits may be a wilful misconduct carve-out, if the agreement contains one, and the outcome will turn heavily on how the term is defined and what has occurred in practice.[8] Other factors include whether the supply agreement provides for make-up or restoration quantities (whether the seller must deliver the shortfall later, or the buyer must take additional volumes in subsequent years), and whether the buyer’s own downstream sales contracts carry matching force majeure protection. A mismatch at any of these points is where the real commercial risk lies.
Lessons for Emerging Fuel Markets
The LNG market’s experience is a useful roadmap for emerging fuels, including hydrogen and biomethane, where the same physical-versus-contractual distinction is likely to recur, albeit in a different form.
In LNG, any obstacle to substitution is contractual: terminal, source or destination. In emerging fuels, it is likely to be regulatory or certification-based. For example:
- A hydrogen producer may supply hydrogen that is physically indistinguishable from the contracted product but fails to qualify as renewable hydrogen under the EU’s Renewable Fuels of Non-Biological Origin (RFNBO) framework, perhaps because the electricity used to produce it does not satisfy the additionality or temporal and geographical correlation requirements.
- Conventional natural gas may be an adequate physical substitute for biomethane without satisfying the sustainability certification an offtake agreement requires.
Moreover, where certification standards are still being written and revised by regulators, the contractual “specification” a party must meet may shift during the life of a long-term agreement. Parties negotiating emerging fuel offtake agreements should consider now how substitution is to be treated, and what happens if the underlying certification standard changes. Both are likely to be heavily contested once these markets reach commercial scale.
Conclusion
Effective risk allocation requires more than identifying when performance may be excused; it requires anticipating the practical and financial consequences of disruption, and being explicit in supply agreements about what alternative performance is permitted, required or simply unavailable. As emerging fuel markets move towards commercial scale, the LNG industry’s experience offers a valuable lesson: while contractual certainty is essential, so is sufficient flexibility to respond when the expected supply arrangements no longer work.
[1] Edison announcement of 27 October 2026, as reported in “Edison: QatarEnergy estende forza maggiore a ulteriori 3 carichi di GNL fino a fine dicembre”, Teleborsa, 27 October 2026; see also “Edison: QatarEnergy extends force majeure until the end of December”, LNG Industry, 28 October 2026.
[2] See, for example, James Barratt, Afolarin Awosika, and Simon Machau, “Force majeure and LNG contracts”, LNG Industry, 23 March 2026.
[3] RTI Ltd v MUR Shipping BV [2024] UKSC 18, in particular at [41]–[46].
[4] Andrew Mills and Maha El Dahan, “QatarEnergy buys US, other LNG to hedge future Hormuz disruptions”, Reuters, 29 October 2026; Woodside Energy Group, “Woodside signs 20-year LNG supply agreement with QatarEnergy”, 29 October 2026.
[5] QatarEnergy, “QatarEnergy marks first LNG export from largest investment in United States – Golden Pass LNG project in Texas”, The Peninsula, 23 April 2026.
[6] Nidhi Verma, “India’s top gas importer sets eyes on US LNG under long-term deal with Qatar”, Reuters, 3 November 2026.
[7] Hadley v Baxendale (1854) 9 Exch 341; Croudace Construction Ltd v Cawoods Concrete Products Ltd [1978] 2 Lloyd’s Rep 55; British Sugar plc v NEI Power Projects Ltd (1997) 87 BLR 42. The position may differ where the contract defines consequential loss more widely.
[8] Wilful misconduct has no fixed meaning in English law and is largely a matter of construction; for the general approach, see Forder v Great Western Railway Co [1905] 2 KB 532 and National Semiconductors (UK) Ltd v UPS Ltd [1996] 2 Lloyd’s Rep 212.