Insight

Closer to the Finish Line: What Changed in the Senate-Passed Permitting Bill and What It Means for Energy Infrastructure

Client Alerts

On November 19, 2026, the Senate voted 62–33 to pass the Bipartisan American Affordability and Jobs Act, signaling strong bipartisan support for what would be the most significant permitting reform legislation in decades. This version of the bill preserves many of the streamlining and fast-tracking provisions of the version introduced in September 2026, including the 150-day statute of limitations for many project challenges, remand without vacatur as the default remedy, an enhanced nationwide permit program, and exemptions from the National Environmental Policy Act (“NEPA”) and the National Historic Preservation Act (“NHPA”) for many natural gas infrastructure and transmission projects. But compared to existing law, it also sets more defined sidebars around several of those provisions and weakens protections aimed to provide more certainty for project developers.

As a supplement to our earlier list of ten ways the bill would promote energy infrastructure, we highlight the most consequential changes from the September version of the bill for project developers. They touch on these key topics:

  1. Adjustments to the project certainty provisions, with some narrower protections for permitted projects;
  2. Continued strong support for natural gas infrastructure development;
  3. An essential fix to the Federal Energy Regulatory Commission’s (“FERC”) backstop siting authority for transmission facilities;
  4. New provisions for judicial review and NEPA streamlining;
  5. A new approach to the NHPA overhaul; and
  6. Partial retreat on the limits imposed on states issuing Clean Water Act water quality certifications.

1. Adjustments to the Project Certainty Provisions, with Some Narrower Protections for Permitted Projects

The September version of the bill contained provisions to bolster project certainty by limiting the ways a later administration could undo agency decisions for projects finalized in a preceding administration. The November version of the bill still offers project developers strong protections against agencies backtracking and revoking approvals, but targeted changes make some of these protections materially weaker.

Broader Grounds for Adverse Post-Permit Actions: The September version of the bill prohibited agencies from rescinding, suspending, or otherwise interfering with fully permitted projects. The updated Section 1401 of the bill expands certain exceptions that would allow the government to suspend, terminate, revoke, or otherwise take action to interfere with authorizations in cases where action is necessary to prevent substantial harm or damage to human health or the environment, or when action is “pursuant to any applicable law or regulation.” These changes are significant because they could, in practice, swallow many of the protections. For example, a new administration could claim some resource or impact was not fully considered in a project’s earlier environmental review, and the “pursuant to any applicable law or regulation” provision would make that avenue even easier, since many environmental and natural resources laws contain provisions allowing suspension or termination of permits on broad, vaguely defined grounds that could require only general alleged harm to property or the environment. The revised exceptions weaken the bill’s protections for developers and still leave room for a future administration to retroactively assert its policy preferences on permitted projects.

New Guardrails on Remedies: The November bill also narrows how a developer might recover damages from the government for adverse post-permit actions. In order to recover delay costs plus 25 to 50 percent for a denied project’s development and construction costs incurred to date, developers must now show that the government acted in bad faith. The government retains the burden of proof but would no longer be held to a “clear and convincing evidence” standard. Developers can still receive some relief without a bad-faith showing, including reinstatement, injunctive relief, attorney fees, and delay costs.

Disparate Treatment: The disparate-treatment claims over permit delays and denials allowed under Section 1402 of the bill would now also require a showing of “bad faith” as part of the government’s pattern of disparate treatment. However, developers would benefit from a broadened comparison period—10 years instead of 5—as well as a presumption that a “substantial increase” in the rate of denials for a category of projects is indicative of bad faith.

One-Year Clock: The November bill also slightly adjusts the timeline for federal approval in favor of developers: For permits not requiring an environmental assessment or environmental impact statement under NEPA, federal agencies must now render decisions within one year of an applicant submitting an application—rather than one year of the application being deemed complete. This prevents agencies from pushing out the one-year clock by delaying or withholding completeness determinations.

2. Continued Strong Support for Natural Gas and Transmission Infrastructure Development

The November bill continues to recognize the importance of streamlining approvals for much-needed energy infrastructure, broadly exempting a wide range of interstate natural gas facility and electric transmission activities, including repairs, upgrades, modifications, and capacity enhancements, from NEPA and NHPA review when they take place in existing rights-of-ways or previously reviewed footprints. The September version of the bill would exempt such an activity as long as it was limited to those areas plus “any minimum additional area adjacent to an existing right-of-way that is necessary to complete” the covered activity. Some pipeline expansion projects using looping frequently have loops that depart from the corridor to avoid congested development or natural features, and it was unclear just how far those loops could deviate before flouting the “minimal additional area adjacent to an existing right-of-way” standard. The November bill addresses this uncertainty by capping that distance to one-quarter mile from the right-of-way’s boundary.

The November bill also expands the transmission project exemption to cover installation of grid-enhancing advanced transmission technologies on existing facilities. The expanded exemption, which November version adds to the Federal Power Act (“FPA”) and which allows these upgrades to proceed without NEPA and NHPA review, reflects a bipartisan desire to make necessary transmission upgrades that can alleviate the rate pressure felt by Americans.

3. At Long Last, a Fix to the FERC Backstop Siting Authority for Transmission Facilities

As we have previously reported, the Energy Policy Act of 2005 gave FERC backstop siting authority in the FPA to permit interstate transmission lines when states lack siting authority or fail to act within one year, but it contains a fatal flaw and has never been successfully used. Presently, FPA Section 216(e) prevents the holder of a FERC backstop permit from exercising eminent domain authority over state lands. Thus, a state opposed to a project authorized under FERC’s backstop siting authority can still block a transmission project simply by refusing to grant real estate easements, and it is practically impossible to build a high-voltage transmission line of any significant length without crossing state-owned lands, which include, among other features, the bottoms of all navigable waters, most of the lands used for interstate highways, and other highways and roadways. The November bill removes that state veto.

The November bill expands where FERC can exercise this siting authority. Currently, this authority applies only within designated national interest electric transmission corridors—or NIETCs. Both versions of the bill would remove the corridor requirement but limit the authority to lines of 230 kV or more that, among other requirements, transmit electric energy in interstate or foreign commerce, are consistent with the public interest, and benefit consumers and improve reliability. The November bill extends this authority to include facilities “necessary to safely and reliably interconnect” those lines and removes the simultaneous FERC-state processing track for 345-kV lines found in the September bill. This brings interconnection facilities such as lower voltage tie-ins and substations within FERC’s backstop siting reach, making it less likely that federally permitted lines are stranded due to connecting facilities being unable to get state approval. This will benefit developers serving data centers and other fast-growing loads.

4. New Provisions for Judicial Review and NEPA Streamlining

The November bill maintains measures to reduce delays from judicial review. A new section extends the 150-day statute of limitations for challenges under NEPA, the Clean Water Act, the Endangered Species Act, the NHPA, the Mineral Leasing Act, and more to projects proceeding under the expedited FAST-41 pathway. As such, enrolling a project in FAST-41 can now offer litigation-risk benefits in addition to scheduling benefits.

A new provision also clarifies the venue for review of agency actions under NEPA. The November bill carves out cases governed by Natural Gas Act Section 19(b) and FPA Section 313(b), so appellate litigation over FERC orders will continue to follow those statutes’ existing judicial review venue provisions. However, claims challenging agency rules on the basis of NEPA compliance, as well as challenges to authorizations for projects with no physical location, will go exclusively to the U.S. Court of Appeals for the D.C. Circuit.

5. A New Approach to the NHPA Overhaul

The September bill aimed to reform the NHPA Section 106 process. The November bill still does this, but in a different way. The November bill maintains the requirement for federal agencies to prepare reports on undertakings that include a determination of the area of potential effects, identify historic properties, describe any adverse effects, and identify prudent and feasible measures to avoid, minimize, or mitigate those effects, subject to comments from State and Tribal Historic Preservation Offices. It also expands obligations to the courts, mandating that absent extraordinary circumstances, they issue a ruling within 120 days after a plaintiff files suit. In keeping with a narrowed focus on federal agency process, the November bill drops the September version’s sanction on State and Tribal Historic Preservation Offices that miss NHPA deadlines, which would have forced the offices to spend 50 percent of their workweeks on the delayed review; the November bill maintains this sanction for senior federal agency staff.

The Senate also responded to backlash against measures perceived as interfering with Tribal sovereignty. The November bill removed provisions that would have imposed a mandatory federal takeover of Tribal Historic Preservation Offices with programs deemed deficient under the NHPA, replacing it with a corrective-action process. The Senate also removed the earlier, narrower definition of properties of traditional religious or cultural importance that could have excised important Tribal sites from the NHPA’s purview.

6. Partial Retreat on the Limits Imposed on States Issuing Clean Water Act Water Quality Certifications

The November bill adjusts some of the Clean Water Act streamlining provisions seen in September. One change is that certifying authorities (like states, some Tribes, and EPA in some circumstances) would be able to deny certification of a Clean Water Act Section 401 application if it still lacks required information after the certifying authority has requested the missing materials and given the applicant a reasonable opportunity to provide them.

A second change relates to one of the provisions the November bill retains to align Section 401 with the Environmental Protection Agency’s January 2026 proposed rule, where it limits certifying authorities from denying or conditioning certifications only if they show, by clear and convincing evidence, that no modification or reasonable condition would avoid a water quality violation and that any conditions placed on the approval are the least burdensome approach to ensure compliance. The November bill removed a third condition, which would have required that the condition be “consistent with the requirements of the Federal license or permit” that is the subject of the application.

And a third change relates to which agency decides which conditions are necessary. The September bill affirmed that a federal agency could not refuse to include a certifying authority’s conditions that were necessary to ensure compliance with a water quality requirement. That left open who decided which conditions were necessary. The November bill clarifies this, stating that the certifying authority decides.

Next Steps

While the bill is closer to the finish line, it must still pass through the House of Representatives, including committee review, before it can reach the President’s desk. Timelines are tight. The House is expected to adjourn for the year in mid-December, and the bill could face new challenges if it is not passed before the new Congress begins in January. Any changes the House makes would also have to be reconciled with the Senate before the bill can be enacted, and the final bill will depend on bipartisan compromises.

We will continue to monitor developments related to permitting reform and the Bipartisan American Affordability and Jobs Act. Please reach out to your Vinson & Elkins team to discuss this matter and its implications for your business.


This information is provided by Vinson & Elkins LLP for educational and informational purposes only and is not intended, nor should it be construed, as legal advice.

Discover our latest:

Insights

Events

Kathy Pakenham Speaking at ABA’s 2026 Criminal Tax Fraud and Tax Controversy Conference

Partner Kathy Pakenham will speak at the American Bar Association’s (ABA) 2026 Criminal Tax Fraud and Tax Controversy Conference on …

December 11, 2026

December 11, 2026 • 1-minute read

Events

Paige Anderson and Vinay Prabhakar to Present on BARBRI Webinar on REIT Tax and Data Centers

Partners Paige Anderson and Vinay Prabhakar will present on BARBRI’s live video CLE program, “Formation and Operation of Data Center …

December 10, 2026

December 10, 2026 • 1-minute read

CLE Events

Texas Data Centers in a New Political Landscape: Post-Midterm Outlook

The 2026 midterm elections are changing the policy landscape for data center development in Texas.

December 3, 2026

December 3, 2026 • 1-minute read

Articles

Non-Bank Capital in Aircraft Finance: Here to Stay

Having entered aircraft finance as banks retreated from the sector, non-bank lenders are now an established part of the market, …

November 23, 2026

November 23, 2026 • 4-minute read

Client Alerts

Q3 2026 Healthcare Antitrust and Competition Update

In the third quarter of 2026, as affordability remained a prominent political issue, federal agencies, state attorneys general, and private …

November 23, 2026

November 23, 2026 • 14-minute read

News & Achievements
V&E

Get in Touch

Thoughts or questions? Send us a note, and we’ll connect you with the right person.

The ESG GC: How Your Role as Chief Legal Officer is Integral To Your Company’s ESG Efforts Background Image